PROGRESS OF CONSTRUCTION - NOVEMBER

29.11.2021
News image 1
  Work is being carried out on the installation of vertical structures and waterproofing at the level of the -1st floor. Work is being carried out on the arrangement of the floor slab - the 1st floor of the parking lot.  